8+ Years Serving Edmonton Homeowners
Local experience across new builds, upgrades, and complete yard transformations.
3-Year Hardscape + 1-Year Landscape Warranty
Workmanship coverage on both hardscape and landscape installs for added confidence.
Licensed & Insured
Fully insured and managed by one accountable team from quote to completion.
No Deposit Required
Clear scope, clear pricing, and no upfront deposit before your project starts.
Sod Installation Projects in Edmonton
Sod installations across Edmonton, Sherwood Park, and Spruce Grove. Tight seams, proper grading, and clean edges — every time.
Sod Installation in Edmonton: A Lawn That Takes Root and Stays Green
A lush, even lawn starts with what's underneath it. Topsoil depth, proper grading, and tight seams at installation determine whether your lawn establishes quickly or struggles through its first season. We focus on preparation first because that foundation is what separates a lawn that performs from one that needs to be redone. Most residential yards are complete in one to two days.
- Step 1: Site Walk and Plan We confirm grading, drainage, access, and the right installation approach for your yard.
- Step 2: Base Prep We level and roll topsoil, correct low and high spots, and cut clean edges along patios, fences, and garden beds.
- Step 3: Sod Layout, Roll and Water Tight seams, staggered joints, and clean edges rolled for full soil contact, plus a clear watering plan before we leave.
New Lawn Installation in Edmonton — Built on the Right Base From Day One
New sod installation is most common on new builds after final grading is complete, or on yards being built out for the first time. The lot is prepped, topsoil goes in, and sod follows in one coordinated scope. No gap between trades, no graded soil sitting exposed through weather changes.
We install 4 to 6 inches of screened topsoil, grade and roll smooth, then lay sod the same day it's harvested. We use locally sourced Manderley Less Water and Kentucky bluegrass blends fitted with tight, staggered seams. We provide a clear watering plan before we leave so establishment starts right.
- 4 to 6" screened topsoil for proper rooting depth
- Same-day harvest sod same day of cut
- Manderley Less Water and Kentucky bluegrass blends
- Staggered seams fitted tight to prevent dry gaps
- Grade and drainage confirmed before any sod goes down
- Clear watering and aftercare plan with every install
Replacing an Existing Lawn in Edmonton. Full Removal, Grading and Fresh Sod
Lawn replacement is the right call when existing turf is patchy, dead, or never properly established — or when a patio, fence, or retaining wall installation has disturbed the surrounding grass. We haul away old grass, correct any grading or drainage issues, and lay fresh sod on properly prepared ground.
Skipping the base correction is where re-sodding jobs fail. New sod laid over poorly draining or uneven ground will show the same problems as the lawn it replaced. We treat every replacement as a fresh install, same topsoil depth, same seam quality, same aftercare guidance, because the result should last.
Comprehensive landscaping in Edmonton & surrounding areas
Residential & commercial
At Serene Landscaping, we proudly offer a full range of landscaping services for both residential and commercial properties across Edmonton and surrounding areas.
Surrounding communities
We serve Edmonton and its surrounding areas, including St. Albert, Sherwood Park, Beaumont, Spruce Grove, Stony Plain, Leduc, Morinville, and Sturgeon County.
What Our Clients Are Saying
Common Questions About Sod Installation in Edmonton
Quick answers about timing, prep, and what to expect for sod installation in Edmonton and area.
Get a Free QuoteNew sod installation typically runs $1.00 – $2.50 per sq ft, while re-sodding ranges from $2.50 – $5.50 per sq ft depending on prep, access, and site conditions. We provide clear quotes after a site visit so you know scope and timeline.
For new builds, yes. We can handle final grading first or coordinate with your builder so the base drains properly.
Late spring through early fall, May through mid-September, is the best window for sod installation in Edmonton. Sod installed before mid-September roots before freeze-up and survives its first winter without special treatment.
Stay off it for 2–3 weeks while roots take hold. First mow happens around 3 weeks in, once you can't pull up the corners.
Every quote includes 4–6 inches of screened topsoil. That’s the professional standard in Edmonton for proper rooting and even establishment.
Yes. Water twice daily for the first 7 days, keeping the sod and top 2 inches of soil consistently moist. Reduce to once daily for days 8 to 14 as roots begin to establish. We provide a written watering schedule before leaving the site.
Contact
Ready for a free quote?
Call us or send a message. We’ll reply within 24 hours. No deposit required.







